Project Timeline & Delivery Intelligence

Track recorded superyacht project stages, verified construction milestones, delivery guidance, builder pipelines and the freshness of each project update.

No invented progress percentages or delivery dates. A project's recorded status shows its current Superyacht Guide project stage. Earlier stages are not automatically treated as independently verified milestones unless a dated milestone is recorded. Expected dates and delivery guidance are shown only where recorded.
Public projects
44
Active pipeline
35
Delivered records
9
Updated ≤90 days
29
With source evidence
44
With dated milestones
20
Delivery-data coverage: 36 public project records currently contain recorded launch or delivery guidance. 0 contain a structured expected launch or delivery date. Free-text guidance such as a year or season is shown as guidance only and is not converted into an invented exact date.
Project pipeline is not build-slot availability. The separate Build Slot & Delivery Tracker currently has no public evidence record proving a specific available slot or hull. Open Build Slot & Delivery Tracker
Clear

Project pipeline

44 matching project records
Construction started

Amels 6010

Amels · 60.00 m
Verified within the last 30 days
Recorded current project stage
Construction started
Workflow reference: Announced → Construction started → Hull joined → Outfitting → Launched → Sea trials → Delivered. Only dated milestones listed below are independently recorded as milestone events.
Delivery
2027
Latest recorded progress

Amels 6010 is under construction at Vlissingen and is scheduled for delivery in 2027.

Latest verified update
3 July 2026
Dated milestones
0
Source records
1
Record verification: Source-backed · Data confidence: High
Outfitting

Amels 8004

Amels · 80.00 m
Hull: 8004
Verified within the last 30 days
Recorded current project stage
Outfitting
Workflow reference: Announced → Construction started → Hull joined → Outfitting → Launched → Sea trials → Delivered. Only dated milestones listed below are independently recorded as milestone events.
Recorded dated milestones
  • 5 June 2025 — Launched
  • 5 June 2025 — Outfitting started
Launch
Launched 5 June 2025
Delivery
2027
Latest recorded progress

Amels 8004 was launched on 5 June 2025 and remains in build for delivery in 2027.

Latest verified update
3 July 2026
Dated milestones
2
Source records
3
Record verification: Source-backed · Data confidence: High
Outfitting

Amels 8005

Amels · 80.00 m
Verified within the last 30 days
Recorded current project stage
Outfitting
Workflow reference: Announced → Construction started → Hull joined → Outfitting → Launched → Sea trials → Delivered. Only dated milestones listed below are independently recorded as milestone events.
Recorded dated milestones
  • 17 December 2025 — Launched
Launch
Launched 17 December 2025
Delivery
2027
Latest recorded progress

Amels 8005 was launched on 17 December 2025 and moved into the outfitting phase for delivery in 2027.

Latest verified update
3 July 2026
Dated milestones
1
Source records
2
Record verification: Source-backed · Data confidence: High
Construction started

Custom DY 75 Hybrid

Damen Yachting · 75.00 m
Verified within the last 30 days
Recorded current project stage
Construction started
Workflow reference: Announced → Construction started → Hull joined → Outfitting → Launched → Sea trials → Delivered. Only dated milestones listed below are independently recorded as milestone events.
Delivery
2026
Latest recorded progress

The custom 75.2-metre hybrid expedition vessel is currently in build for delivery in 2026.

Latest verified update
3 July 2026
Dated milestones
0
Source records
1
Record verification: Source-backed · Data confidence: High
Sea trials

Project Tanzanite

Amels · 120.00 m
Verified within the last 30 days
Recorded current project stage
Sea trials
Workflow reference: Announced → Construction started → Hull joined → Outfitting → Launched → Sea trials → Delivered. Only dated milestones listed below are independently recorded as milestone events.
Recorded dated milestones
  • 5 September 2025 — Launched
  • 7 October 2025 — Sea trials started
Launch
Launched 5 September 2025
Delivery
2026
Latest recorded progress

Project Tanzanite was launched in September 2025, entered sea trials and remains in build for completion in 2026.

Latest verified update
3 July 2026
Dated milestones
2
Source records
3
Record verification: Source-backed · Data confidence: High
Announced / pre-construction

The 5th 53-metre Yacht Support

Damen Yachting · 53.00 m
Verified within the last 30 days
Recorded current project stage
Announced / pre-construction
Workflow reference: Announced → Construction started → Hull joined → Outfitting → Launched → Sea trials → Delivered. Only dated milestones listed below are independently recorded as milestone events.
Delivery
2028
Latest recorded progress

The fifth 53-metre Yacht Support is offered as a new-build vessel for delivery in 2028. Its precise construction phase has not been publicly specified.

Latest verified update
3 July 2026
Dated milestones
0
Source records
1
Record verification: Source-backed · Data confidence: High
Construction started

Xplorer 6002

Damen Yachting · 60.10 m
Verified within the last 30 days
Recorded current project stage
Construction started
Workflow reference: Announced → Construction started → Hull joined → Outfitting → Launched → Sea trials → Delivered. Only dated milestones listed below are independently recorded as milestone events.
Delivery
2028
Latest recorded progress

Official Xplorer information continues to list Xplorer 6002 in build for delivery in 2028.

Latest verified update
3 July 2026
Dated milestones
0
Source records
1
Record verification: Source-backed · Data confidence: High
Construction started

Amels 8006

Amels · 79.80 m
Hull: 8006
Verified within the last 30 days
Recorded current project stage
Construction started
Workflow reference: Announced → Construction started → Hull joined → Outfitting → Launched → Sea trials → Delivered. Only dated milestones listed below are independently recorded as milestone events.
Delivery
Spring 2028
Latest recorded progress

Amels 8006 is currently in build as an Amels 80 Limited Editions yacht, with delivery scheduled for spring 2028.

Latest verified update
2 July 2026
Dated milestones
0
Source records
1
Record verification: Source-backed · Data confidence: High
Construction started

Bilgin 173-I

Bilgin Yachts · 53.00 m
Hull: NB89
Verified within the last 30 days
Recorded current project stage
Construction started
Workflow reference: Announced → Construction started → Hull joined → Outfitting → Launched → Sea trials → Delivered. Only dated milestones listed below are independently recorded as milestone events.
Delivery
2027
Latest recorded progress

Bilgin 173-I, hull NB89, is one of the yard's new 53-metre 499 GT series yachts and is under construction for 2027 delivery.

Latest verified update
2 July 2026
Dated milestones
0
Source records
1
Record verification: Source-backed · Data confidence: High
Construction started

Project Diana

Heesen Yachts · 55.00 m
Hull: YN 21455
Verified within the last 30 days
Recorded current project stage
Construction started
Workflow reference: Announced → Construction started → Hull joined → Outfitting → Launched → Sea trials → Delivered. Only dated milestones listed below are independently recorded as milestone events.
Delivery
Q2 2027
Latest recorded progress

Project Diana is under construction at Heesen’s Oss shipyard. The current official programme schedules delivery for Q2 2027.

Latest verified update
2 July 2026
Dated milestones
0
Source records
2
Record verification: Source-backed · Data confidence: High
Construction started

Tankoa 61MT Full Custom C135

Tankoa Yachts · 61.00 m
Project: Tankoa 61MT Full Custom
Hull: C135
Verified within the last 30 days
Recorded current project stage
Construction started
Workflow reference: Announced → Construction started → Hull joined → Outfitting → Launched → Sea trials → Delivered. Only dated milestones listed below are independently recorded as milestone events.
Delivery
2029
Latest recorded progress

Tankoa C135 is a 61-metre full-custom yacht under construction for delivery in 2029.

Latest verified update
2 July 2026
Dated milestones
0
Source records
1
Record verification: Source-backed · Data confidence: High
Construction started

Tankoa T450 C114

Tankoa Yachts · 45.00 m
Project: Tankoa T450
Hull: C114
Verified within the last 30 days
Recorded current project stage
Construction started
Workflow reference: Announced → Construction started → Hull joined → Outfitting → Launched → Sea trials → Delivered. Only dated milestones listed below are independently recorded as milestone events.
Delivery
2026
Latest recorded progress

Tankoa C114 is the first hull of the 45-metre T450 series and is under construction for delivery in 2026.

Latest verified update
2 July 2026
Dated milestones
0
Source records
1
Record verification: Source-backed · Data confidence: High
Construction started

Tankoa T500 Custom C116

Tankoa Yachts · 50.00 m
Project: Tankoa T500 Custom
Hull: C116
Verified within the last 30 days
Recorded current project stage
Construction started
Workflow reference: Announced → Construction started → Hull joined → Outfitting → Launched → Sea trials → Delivered. Only dated milestones listed below are independently recorded as milestone events.
Delivery
2027
Latest recorded progress

Tankoa C116 is a 50-metre T500 Custom yacht under construction for delivery in 2027.

Latest verified update
2 July 2026
Dated milestones
0
Source records
1
Record verification: Source-backed · Data confidence: High
Construction started

Tankoa T500 Custom C120

Tankoa Yachts · 50.00 m
Project: Tankoa T500 Custom
Hull: C120
Verified within the last 30 days
Recorded current project stage
Construction started
Workflow reference: Announced → Construction started → Hull joined → Outfitting → Launched → Sea trials → Delivered. Only dated milestones listed below are independently recorded as milestone events.
Delivery
2027
Latest recorded progress

Tankoa C120 is a 50-metre T500 Custom yacht under construction for delivery in 2027.

Latest verified update
2 July 2026
Dated milestones
0
Source records
1
Record verification: Source-backed · Data confidence: High
Construction started

Tankoa T500 Custom C133

Tankoa Yachts · 50.00 m
Project: Tankoa T500 Custom
Hull: C133
Verified within the last 30 days
Recorded current project stage
Construction started
Workflow reference: Announced → Construction started → Hull joined → Outfitting → Launched → Sea trials → Delivered. Only dated milestones listed below are independently recorded as milestone events.
Delivery
2028
Latest recorded progress

Tankoa C133 is a 50-metre T500 Custom yacht under construction for delivery in 2028.

Latest verified update
2 July 2026
Dated milestones
0
Source records
1
Record verification: Source-backed · Data confidence: High
Construction started

Tankoa T55 Sportiva C119

Tankoa Yachts · 55.00 m
Project: Tankoa T55 Sportiva
Hull: C119
Verified within the last 30 days
Recorded current project stage
Construction started
Workflow reference: Announced → Construction started → Hull joined → Outfitting → Launched → Sea trials → Delivered. Only dated milestones listed below are independently recorded as milestone events.
Delivery
2027
Latest recorded progress

Tankoa C119 is a 55-metre T55 Sportiva yacht under construction for delivery in 2027.

Latest verified update
2 July 2026
Dated milestones
0
Source records
1
Record verification: Source-backed · Data confidence: High
Construction started

Tankoa T560 Apache C132

Tankoa Yachts · 56.00 m
Project: Tankoa T560 Apache
Hull: C132
Verified within the last 30 days
Recorded current project stage
Construction started
Workflow reference: Announced → Construction started → Hull joined → Outfitting → Launched → Sea trials → Delivered. Only dated milestones listed below are independently recorded as milestone events.
Delivery
2026
Latest recorded progress

Tankoa C132 is the 56-metre T560 Apache under construction for delivery in 2026.

Latest verified update
2 July 2026
Dated milestones
0
Source records
1
Record verification: Source-backed · Data confidence: High
Sea trials

Project 828

Feadship · 89.60 m
Hull: 828
Verified within the last 30 days
Recorded current project stage
Sea trials
Workflow reference: Announced → Construction started → Hull joined → Outfitting → Launched → Sea trials → Delivered. Only dated milestones listed below are independently recorded as milestone events.
Recorded dated milestones
  • 6 June 2026 — Launched
  • 29 June 2026 — Sea trials started
Launch
Launched 6 June 2026
Delivery
2026
Latest recorded progress

Project 828, also known as Milky Way, was launched in Amsterdam in June 2026 and is now undergoing sea trials.

Latest verified update
30 June 2026
Dated milestones
2
Source records
2
Record verification: Source-backed · Data confidence: High
Delivered

LOLLIPOP

Moonen Yachts · 37.40 m
Verified 31–90 days ago
Recorded current project stage
Delivered
Workflow reference: Announced → Construction started → Hull joined → Outfitting → Launched → Sea trials → Delivered. Only dated milestones listed below are independently recorded as milestone events.
Recorded dated milestones
  • 18 June 2026 — Delivered
Delivery
Delivered 18 June 2026
Latest recorded progress

Moonen delivered LOLLIPOP to her owners on 18 June 2026.

Latest verified update
18 June 2026
Dated milestones
1
Source records
2
Record verification: Source-backed · Data confidence: High
Delivered

NETTO II

Amels · 80.00 m
Verified 31–90 days ago
Recorded current project stage
Delivered
Workflow reference: Announced → Construction started → Hull joined → Outfitting → Launched → Sea trials → Delivered. Only dated milestones listed below are independently recorded as milestone events.
Latest recorded progress

The former Amels 8002 is now named NETTO II. Amels confirms delivery in 2026 and departure on her maiden voyage on 15 June 2026.

Latest verified update
15 June 2026
Dated milestones
0
Source records
2
Record verification: Source-backed · Data confidence: High
Delivered

RAFTER

Damen Yachting · 53.00 m
Verified 31–90 days ago
Recorded current project stage
Delivered
Workflow reference: Announced → Construction started → Hull joined → Outfitting → Launched → Sea trials → Delivered. Only dated milestones listed below are independently recorded as milestone events.
Recorded dated milestones
  • 18 March 2026 — Launched
  • 12 June 2026 — Delivered
Launch
Launched 18 March 2026
Delivery
Delivered 12 June 2026
Latest recorded progress

The fourth YS53 was launched on 18 March 2026 and delivered under the name RAFTER on 12 June 2026.

Latest verified update
12 June 2026
Dated milestones
2
Source records
3
Record verification: Source-backed · Data confidence: High
Launched

Project Thunderball

CRN Yachts · 70.00 m
Hull: CRN M/Y 145
Verified 31–90 days ago
Recorded current project stage
Launched
Workflow reference: Announced → Construction started → Hull joined → Outfitting → Launched → Sea trials → Delivered. Only dated milestones listed below are independently recorded as milestone events.
Recorded dated milestones
  • 4 June 2026 — Launched
Launch
Launched 4 June 2026
Delivery
Summer 2026
Latest recorded progress

Project Thunderball launched at CRN's Ancona yard on 4 June 2026. Outfitting, trials and testing continue ahead of handover in summer 2026.

Latest verified update
4 June 2026
Dated milestones
1
Source records
2
Record verification: Source-backed · Data confidence: High
Construction started

Martinique YN208

Moonen Yachts · 37.40 m
Verified 31–90 days ago
Recorded current project stage
Construction started
Workflow reference: Announced → Construction started → Hull joined → Outfitting → Launched → Sea trials → Delivered. Only dated milestones listed below are independently recorded as milestone events.
Delivery
June 2027
Latest recorded progress

Moonen YN208 remains under construction following its latest hull milestone, with delivery scheduled for June 2027.

Latest verified update
2 June 2026
Dated milestones
0
Source records
2
Record verification: Source-backed · Data confidence: High
Announced / pre-construction

Project Ananda

Heesen Yachts · 72.30 m
Hull: YN 21872
Verified 31–90 days ago
Recorded current project stage
Announced / pre-construction
Workflow reference: Announced → Construction started → Hull joined → Outfitting → Launched → Sea trials → Delivered. Only dated milestones listed below are independently recorded as milestone events.
Launch
2030
Delivery
Q1 2030
Latest recorded progress

Design, naval architecture and tank testing are complete. Keel laying is scheduled for November 2026, with launch and delivery anticipated in 2030.

Latest verified update
1 June 2026
Dated milestones
0
Source records
2
Record verification: Source-backed · Data confidence: High
Sea trials

Amels 8003

Amels · 79.80 m
Project: Project Zurich
Hull: 8003
Verified 31–90 days ago
Recorded current project stage
Sea trials
Workflow reference: Announced → Construction started → Hull joined → Outfitting → Launched → Sea trials → Delivered. Only dated milestones listed below are independently recorded as milestone events.
Recorded dated milestones
  • 22 May 2026 — Sea trials started
Delivery
2026
Latest recorded progress

Amels 8003, known as Project Zurich, began sea trials in May 2026 and is progressing through the final stages before delivery.

Latest verified update
22 May 2026
Dated milestones
1
Source records
2
Record verification: Source-backed · Data confidence: High
Sea trials

Project 1014

Feadship · 101.20 m
Hull: 1014
Verified 31–90 days ago
Recorded current project stage
Sea trials
Workflow reference: Announced → Construction started → Hull joined → Outfitting → Launched → Sea trials → Delivered. Only dated milestones listed below are independently recorded as milestone events.
Latest recorded progress

Feadship Project 1014 completed its latest recorded North Sea trials on 21 May 2026.

Latest verified update
21 May 2026
Dated milestones
0
Source records
5
Record verification: Source-backed · Data confidence: High
Delivered

QU2

Amels · 60.00 m
Verified 31–90 days ago
Recorded current project stage
Delivered
Workflow reference: Announced → Construction started → Hull joined → Outfitting → Launched → Sea trials → Delivered. Only dated milestones listed below are independently recorded as milestone events.
Recorded dated milestones
  • 12 May 2026 — Delivered
Delivery
Delivered 12 May 2026
Latest recorded progress

Amels 60 QU2 was delivered and departed Vlissingen on 12 May 2026.

Latest verified update
12 May 2026
Dated milestones
1
Source records
2
Record verification: Source-backed · Data confidence: High
Launched

Sea Raider X

ISA Yachts · 67.00 m
Verified 31–90 days ago
Recorded current project stage
Launched
Workflow reference: Announced → Construction started → Hull joined → Outfitting → Launched → Sea trials → Delivered. Only dated milestones listed below are independently recorded as milestone events.
Recorded dated milestones
  • 8 May 2026 — Launched
Launch
Launched 8 May 2026
Delivery
2026
Latest recorded progress

ISA Yachts launched the 67-metre Sea Raider X on 8 May 2026.

Latest verified update
8 May 2026
Dated milestones
1
Source records
3
Record verification: Partially verified · Data confidence: Medium
Delivered

Legacy 4

Codecasa · 57.00 m
Verified 31–90 days ago
Recorded current project stage
Delivered
Workflow reference: Announced → Construction started → Hull joined → Outfitting → Launched → Sea trials → Delivered. Only dated milestones listed below are independently recorded as milestone events.
Recorded dated milestones
  • 23 February 2026 — Launched
  • 27 April 2026 — Delivered
Launch
Launched 23 February 2026
Delivery
Delivered 27 April 2026
Latest recorded progress

Codecasa launched Legacy 4 on 23 February 2026 and delivered her on 27 April 2026.

Latest verified update
27 April 2026
Dated milestones
2
Source records
3
Record verification: Source-backed · Data confidence: High
Launched

Feadship Project 826

Feadship · 80.00 m
Project: Project 826
Hull: 826
Verified 91–180 days ago
Recorded current project stage
Launched
Workflow reference: Announced → Construction started → Hull joined → Outfitting → Launched → Sea trials → Delivered. Only dated milestones listed below are independently recorded as milestone events.
Recorded dated milestones
  • 15 April 2026 — Launched
Launch
Launched 15 April 2026
Latest recorded progress

The 80-metre Feadship project was launched in April 2026 before entering its final completion programme.

Latest verified update
15 April 2026
Dated milestones
1
Source records
1
Record verification: Source-backed · Data confidence: High
Delivered

Gray Cliffs

Feadship · 49.50 m
Project: Project 717
Hull: 717
Verified 91–180 days ago
Recorded current project stage
Delivered
Workflow reference: Announced → Construction started → Hull joined → Outfitting → Launched → Sea trials → Delivered. Only dated milestones listed below are independently recorded as milestone events.
Recorded dated milestones
  • 8 January 2026 — Launched
  • 9 April 2026 — Delivered
Launch
Launched 8 January 2026
Delivery
Delivered 9 April 2026
Latest recorded progress

Formerly known as Project 717, Gray Cliffs completed sea trials and was delivered to her owner in April 2026.

Latest verified update
9 April 2026
Dated milestones
2
Source records
3
Record verification: Source-backed · Data confidence: High
Hull and superstructure joined

Royal Huisman Project 412

Royal Huisman · 81.00 m
Project: Project 412
Hull: 412
Verified 91–180 days ago
Recorded current project stage
Hull and superstructure joined
Workflow reference: Announced → Construction started → Hull joined → Outfitting → Launched → Sea trials → Delivered. Only dated milestones listed below are independently recorded as milestone events.
Recorded dated milestones
  • 31 March 2026 — Hull and superstructure joined
Delivery
2028
Latest recorded progress

The main hull of Project 412 has been turned upright and its bow section joined. Integration, outfitting and finishing are now progressing toward 2028 delivery.

Latest verified update
31 March 2026
Dated milestones
1
Source records
2
Record verification: Source-backed · Data confidence: High
Launched

Project Sophia

Heesen Yachts · 50.00 m
Hull: YN 21150
Verified 91–180 days ago
Recorded current project stage
Launched
Workflow reference: Announced → Construction started → Hull joined → Outfitting → Launched → Sea trials → Delivered. Only dated milestones listed below are independently recorded as milestone events.
Recorded dated milestones
  • 14 March 2026 — Launched
Launch
Launched 14 March 2026
Latest recorded progress

Launched by Heesen on 14 March 2026. Later sea-trial and delivery milestones will be added when their exact dates are verified.

Latest verified update
14 March 2026
Dated milestones
1
Source records
1
Record verification: Source-backed · Data confidence: High
Delivered

ALVA

Amels · 60.00 m
Verified 91–180 days ago
Recorded current project stage
Delivered
Workflow reference: Announced → Construction started → Hull joined → Outfitting → Launched → Sea trials → Delivered. Only dated milestones listed below are independently recorded as milestone events.
Recorded dated milestones
  • 6 March 2026 — Delivered
Delivery
Delivered 6 March 2026
Latest recorded progress

Damen Yachting announced the delivery of the Amels 60 ALVA on 6 March 2026.

Latest verified update
6 March 2026
Dated milestones
1
Source records
2
Record verification: Source-backed · Data confidence: High
Outfitting

Martinique YN207

Moonen Yachts · 37.40 m
Verified 91–180 days ago
Recorded current project stage
Outfitting
Workflow reference: Announced → Construction started → Hull joined → Outfitting → Launched → Sea trials → Delivered. Only dated milestones listed below are independently recorded as milestone events.
Delivery
January 2027
Latest recorded progress

Moonen YN207 entered outfitting after its hull and superstructure were joined, with delivery scheduled for January 2027.

Latest verified update
3 March 2026
Dated milestones
0
Source records
2
Record verification: Source-backed · Data confidence: High
Outfitting

Project Evita

Heesen Yachts · 56.70 m
Hull: YN 21557
Verified 91–180 days ago
Recorded current project stage
Outfitting
Workflow reference: Announced → Construction started → Hull joined → Outfitting → Launched → Sea trials → Delivered. Only dated milestones listed below are independently recorded as milestone events.
Recorded dated milestones
  • 23 January 2026 — Hull and superstructure joined
Delivery
Q3 2027
Latest recorded progress

The hull and superstructure have been joined. Technical systems and bespoke interior outfitting are under way, with delivery scheduled for Q3 2027.

Latest verified update
23 January 2026
Dated milestones
1
Source records
1
Record verification: Source-backed · Data confidence: High
Construction started

Project Angelica

Heesen Yachts · 55.00 m
Hull: YN 21255
Review update
Recorded current project stage
Construction started
Workflow reference: Announced → Construction started → Hull joined → Outfitting → Launched → Sea trials → Delivered. Only dated milestones listed below are independently recorded as milestone events.
Launch
October 2026
Delivery
Q2 2027
Latest recorded progress

Project Angelica is under construction. Heesen’s January 2026 programme schedules launch for October 2026, with delivery scheduled for Q2 2027.

Latest verified update
12 January 2026
Dated milestones
0
Source records
2
Record verification: Source-backed · Data confidence: High
Outfitting

Project Setteesettanta

Heesen Yachts · 57.00 m
Hull: YN 20857
Review update
Recorded current project stage
Outfitting
Workflow reference: Announced → Construction started → Hull joined → Outfitting → Launched → Sea trials → Delivered. Only dated milestones listed below are independently recorded as milestone events.
Delivery
2026
Latest recorded progress

The hull and superstructure have been joined and the yacht entered outfitting. Heesen’s January 2026 programme scheduled an April 2026 launch, but no later official launch confirmation has been applied. Delivery remains scheduled for 2026.

Latest verified update
12 January 2026
Dated milestones
0
Source records
2
Record verification: Source-backed · Data confidence: High
Outfitting

Project Y729

Oceanco · 80.00 m
Hull: Y729
Review update
Recorded current project stage
Outfitting
Workflow reference: Announced → Construction started → Hull joined → Outfitting → Launched → Sea trials → Delivered. Only dated milestones listed below are independently recorded as milestone events.
Recorded dated milestones
  • 12 December 2025 — Outfitting started
Delivery
2027
Latest recorded progress

Project Y729 has transferred to Oceanco's Alblasserdam facilities for final outfitting ahead of launch, sea trials and delivery in 2027.

Latest verified update
12 December 2025
Dated milestones
1
Source records
1
Record verification: Source-backed · Data confidence: High
Construction started

Project Poe

CRN Yachts · 67.00 m
Hull: CRN M/Y 146
Review update
Recorded current project stage
Construction started
Workflow reference: Announced → Construction started → Hull joined → Outfitting → Launched → Sea trials → Delivered. Only dated milestones listed below are independently recorded as milestone events.
Latest recorded progress

Project Poe, CRN M/Y 146, is a 67-metre Nuvolari Lenard full-custom yacht currently under construction at CRN in Ancona.

Latest verified update
19 September 2025
Dated milestones
0
Source records
2
Record verification: Source-backed · Data confidence: High
Hull and superstructure joined

Project Grace

Heesen Yachts · 50.00 m
Hull: YN 21350
Review update
Recorded current project stage
Hull and superstructure joined
Workflow reference: Announced → Construction started → Hull joined → Outfitting → Launched → Sea trials → Delivered. Only dated milestones listed below are independently recorded as milestone events.
Recorded dated milestones
  • 15 September 2025 — Hull and superstructure joined
Delivery
Q1 2028
Latest recorded progress

The steel hull and aluminium superstructure have been joined at Heesen’s Oss shipyard. Delivery is scheduled for Q1 2028.

Latest verified update
15 September 2025
Dated milestones
1
Source records
2
Record verification: Source-backed · Data confidence: High
Outfitting

Royal Huisman Project 410

Royal Huisman · 85.00 m
Project: Project 410
Hull: 410
Review update
Recorded current project stage
Outfitting
Workflow reference: Announced → Construction started → Hull joined → Outfitting → Launched → Sea trials → Delivered. Only dated milestones listed below are independently recorded as milestone events.
Recorded dated milestones
  • 25 July 2024 — Hull and superstructure joined
  • 25 July 2024 — Outfitting started
Latest recorded progress

Project 410's aluminium hull has been turned upright. Royal Huisman is progressing onboard systems, outfitting and the remaining structural work.

Latest verified update
25 July 2024
Dated milestones
2
Source records
2
Record verification: Source-backed · Data confidence: High
Delivered

BG

Feadship · 46.88 m
Hull: 642
Review update
Recorded current project stage
Delivered
Workflow reference: Announced → Construction started → Hull joined → Outfitting → Launched → Sea trials → Delivered. Only dated milestones listed below are independently recorded as milestone events.
Latest verified update
Not recorded
Dated milestones
0
Source records
1
Record verification: Source-backed · Data confidence: High
Delivered

Vanish

Feadship · 71.50 m
Review update
Recorded current project stage
Delivered
Workflow reference: Announced → Construction started → Hull joined → Outfitting → Launched → Sea trials → Delivered. Only dated milestones listed below are independently recorded as milestone events.
Latest verified update
Not recorded
Dated milestones
0
Source records
1
Record verification: Source-backed · Data confidence: High
Interpretation: A recorded stage, expected year, expected date or delivery statement reflects the latest information held in the Superyacht Guide record. A passed expected date without an actual milestone should trigger re-verification; it should not automatically be described as an official delay. Builder pipeline counts represent only public project records in this database.